Apartment Finishing Contract: 10 Clauses to Check Before Signing
Before choosing the best finishing company in Egypt, make sure you have what really protects you: a clear apartment finishing contract. A detailed contract prevents disputes and guarantees you get what was agreed. In this guide, GSC explains the clauses to review before signing.
Why the Contract Matters More Than the Quote
A quote shows the price, but the contract defines responsibilities, specifications, deadlines and how disputes are handled. Many finishing problems start with a short, vague contract that does not name materials or timelines.

Essential Clauses
- Parties and property details: address and actual area.
- Scope of work: every item from rough-in to handover.
- Material specifications: brand, grade and size for each item.
- Drawings: design files attached as part of the contract.
- Price and method: lump sum or per square meter with a bill of quantities.
Timeline, Payments and Penalties
The contract should state start and handover dates with a schedule for each stage. Link payments to completed milestones, such as rough-in, plastering and flooring, and include a clear delay penalty.
Variations and Extra Work
Any change during execution should be added through a written addendum stating cost and extra time. This protects you from surprises in the final bill.
Warranty and Handover
- A clear warranty period for plumbing, electrical and waterproofing.
- Initial handover with a snag list, then final handover after fixes.
- Delivery of manuals and warranties for fixtures and appliances.
How GSC Contracts With Clients
At GSC we start with a site visit and design, then provide a detailed quote with a bill of quantities and named materials, and link payments to milestones under a site engineer. Learn more about our finishing service.
Frequently Asked Questions
Is a quote enough without a contract?
No. A quote does not define responsibilities, warranty or penalties, so a detailed contract is essential.
What is the most important clause?
Detailed material specifications, because they determine the real quality and cost.
How should payments be split?
Link each payment to a completed stage such as rough-in, plastering, flooring and handover.